Our plant is located in Muratlı industrial zone in Muratlı, Tekirdağ with 190.000m² outdoor and 50.000 m² indoor space.
She has the biggest integrated capacity in Turkey With;
Crushing 2.100Mt /Per day
Refinery 1.100Mt /Per day
Bottling 1.500Mt /Per day.
<